Q65.
Question
At a certain cheerleading competition, the maximum time per team, including the setup, is 3 minutes. The Ridgeview High School squad’s performance time is 2 minutes and 34 seconds. How much time does the squad have left for their setup?
Step-by-Step Solution
Verified Answer
The total time left for their setup is 26 seconds.
1Step 1. Given information.
Total minutes given = 3 minutes.
Performance time = 2 minutes and 34 seconds.
2Step 2. Introduce the variable.
Consider the setup time of the squad be x.
3Step 3. Write the equation.
1 minute = 60 seconds
So,
3 minutes seconds.
And
2 minutes 34 seconds seconds
Since the maximum time per team is 3 minutes.
Therefore,
4Step 4. Solve the equation.
Take the equation .
Subtract 154 from both sides of the above equation.
So,
Other exercises in this chapter
Q63.
The world’s largest passenger plane, the Airbus A380, was first used by Singapore Airlines in 2005.How many passengers will a similarly set-up 747 transpo
View solution Q64.
In 2004, approximately 5 million cars and trucks were classified as flex-fuel, which means they could run on gasoline or ethanol. In 2006, that number increased
View solution Q65.
At a certain cheerleading competition, the maximum time per team, including the setup, is 3 minutes. The Ridgeview High School squad’s performance time is
View solution Q67.
A certain movie made \(1.6 million in ticket sales. Its sequel made \)0.8 million in ticket sales. How much more did the first movie make than the sequel?
View solution