Problem 1
The methodology for a Lean Six Sigma QI team will include consideration of all of the following factors EXCEPT: a. Define b. Measure c. Analyze d. Improve e. Communicate
4 step solution
Problem 3
Calculate the Sigma value for sodium given that the total allowable error is \(8 \%\), the bias is \(0.9 \%\), and the \(\mathrm{CV}\) is \(2 \%\). a. \(3.6\) b. \(2.7\) c. \(\quad 7.1\) d. \(4.5\) e. \(6.7\)
4 step solution
Problem 5
Which team member is the coach in a Lean Six Sigma project? a. Yellow Belts b. Green Belts c. Black Belts d. Blue Belts e. Sponsors or Champions
3 step solution
Problem 7
Which one of these is a best fit for a Kaizen project (Lean)? a. Design of a new laboratory b. Improving the flow of a laboratory c. Improving the turnaround times for the laboratory d. Reducing laboratory billing errors e. Both \(\mathrm{b}\) and \(\mathrm{C}\)
4 step solution
Problem 8
Which one of these is best for a Six Sigma project? a. Design of a new lab b. Reducing defects of the billing process c. Reducing defects of blood wastage d. Both \(\mathrm{b}\) and \(\mathrm{c}\) e. Selecting \(\mathrm{QC}\) rules for a lab test
4 step solution
Problem 9
What is not a major component of the IQCP? a. Quality Assurance b. Risk Assessment c. SDS d. Quality Control Plan
3 step solution
Problem 11
What are key components of Risk Assessment in IQCP a. Testing personnel b. Environment c. Reagents d. Test system e. Specimens f. All of the above
8 step solution